The purpose of this project was to provide a road with a design life of 40 years while completing the works with minimal disruption to road users. Section 2 of the Bucketts Way Reconstruction from the Bucketts Way Landfill (ch 0m) to Tinonee (ch 2690m) incorporated the following works:
- Provision of traffic control measures
- Clearing of the site
- Installation and maintenance of sedimentation and erosion control measures
- Construction of table drains
- Installation of subsurface drainage infrastructure and sub-soil drainage
- Pavement reconstruction
- Bitumen seal installation
- Line marking
- Re-establishment of signage
- Regeneration of disturbed area.